

Adzopé’s exclusive research permit (PER) is located near Abidjan in south-eastern Ivory Coast. It covers a total area of 186 km². OMCI completed the acquisition, in 2013, of the Adzopé mining permit from Newmont Mining. This permit is currently being renewed. During the first drilling campaigns, two zones proved to be particularly interesting : * Zone of Kong – 64 drillings – 3,508 meters: gold anomalies *Zone of Adonkoi – 44 drillings – 3,145 meters : 2m@5,4g/t, 12m@1,54g/t, 4m@5,49g/t, 2m@10,8g/t The entire area explored is characterized by highly maintained agricultural fields. We find fields of cocoa, rubber, coffee as well as mandarin trees, manioc and grapefruits which will make it very difficult to develop the site. Mineralization appears subvertical and this type of mineralization can be difficult to target and study by drilling. Despite some interesting anomalous zones, this permit by its context and geology does not demonstrate an interest that would justify an additional exploration campaign.
2015 Auplata acquires OMCI in Ivory Coast and Groupe Atlantique takes a stake in OMCI.
2016 Exclusive negotiations between AUPLATA and Newcrest for a strategic agreement in Ivory Coast.
On the 25th of February 2015, the Council of Ministers granted OMCI, for a first period of 4 years, two PERs called PER Mont Goma Sud (445 km²) and Mont Goma Nord (228 km²), for a total area of 673 km². These two PERs are located some 12 km southwest of the city of Seguela in western Ivory Coast. Between 2009 and 2010, a geochemical prospecting campaign revealed 4 anomalies that should justify the continuation of the exploration on
these two PER. These gold occurrences seem to occupy privileged positions, meaning that they are located at the edge of the Intrageo-synclines or (IGS) that control almost all the gold regions in the Ivory Coast. The search for gold deposits along the SEGUELA shear zone deserves further examination.
Concession Mont Goma
Superficie en km² 299,4
2015 Auplata acquires OMCI in Ivory Coast and Groupe Atlantique takes a stake in OMCI.
2015 Exclusive negotiations between Auplata and Newcrest for a strategic agreement in Ivory Coast.
Tabaroucht Mine (Copper):
The Tabaroucht mining area located 50 km southeast of the town of Beni Mellal Fig 2, contains a copper mineralization hosted in a layer affecting the Cretaceous sandstones and the base of the Dogger limestones. This layer shows a dimension 250 m by 250 m on a power of 12 m, slightly sloping to the north and flush in some places. The copper mineralization is 70% oxidized. CMT has carried out several preliminary research works on these mineralizations (soundings, small wells, two galleries). This work made it possible to estimate the resource reserves in this area, which amount to more than 2 million tonnes of ore with a copper content of 1.4%. The tests for the treatment of this ore are in progress.
The mining center of Tighza is located in the administrative region of Meknes – Tafilalet, in the Middle Atlas, 5 km from the town of M’rirt (90 km south of Meknes).
The farm occupies the center of an area of high hills rising to 1,494 m at Jbel Aouam, and between the trays of M’rirt southeast and Tanadra west.
Geologically, the mining center is located in the northeastern part of Hercynian Morocco. It is integrated in the evolution of the magmatic and hydrothermal events of the northern part of the Moroccan Meseta and is characterized by four granitic points and Pb / Zn / Ag / Au / W polymetallic mineralizations:
. Lead, zinc and silver in the form of MF veins, galena and silver blende
. Gold, vein or in skarns, bound to quartz and sulphides
. Tungsten stratoid and vein, in the form of scheelite and wolframite.
Key figures
. Annual production: 320 000 ttv, 25 600 t of Pb-Ag concentrates, 4 300 t of Zn concentrates.
. 3 seats in operation
. Hollow vein structures and rooting known from surveys over 1000m
. Staff: 300 people, including 25 executives
. Research budget: 35 to 50 million dh / year
. Annual investments: 40 to 45 million dirhams.
Ore extraction
The Tighza mine is underground and operates 3 veins: Signal, Ighrem Aoussar and Sidi Ahmed. Each of the three operating headquarters has two main wells, one for extraction and the other for service. These wells reach depths of more than 750 m.
The exploitation of the Tighza site currently uses three methods of exploitation, according to the morphology of the deposit and its geotechnical characteristics (land holdings, deepening of mineralization, width of mineralization, mineralization richness, water presence, etc. .).
The mining cycle at the Tighza mine can be illustrated as follows:
Production background – Extraction – Processing
The reserves and exploitable resources of the Tighza mining site, calculated at the end of December 2017, amount to more than 5,977 Kttv of ore. The average geological grades at the end of December 2017 are 7.54% for lead, 1.06% for zinc and 147 gr / t for silver. The research work carried out in parallel with the operation is intended to rebuild the reserves, prepare the mine and consequently extend the life of the mine site. These have made it possible over the last few years to restore them beyond exploited tonnages. Research work consists mainly of:
Geophysics and geochemistry from the surface.
Soundings from the day or from the bottom of the mine;
Mining works (galleries, wells and chimneys);
The evolution of resources and reserves between 2016 and 2017 is detailed in the following table (in Kt):
Midelt lead field:
The veins of Hautes Moulouya are located in the province of Midelt. Since 2011, a research program involving topo-geological work, sampling and core drilling surveys has been carried out in this area. No less than 9000m of daytime soundings were carried out. The results are encouraging and have highlighted resources from about 1,500,000 t to 4% Pb. A subsidiary of CMT has been created, MINREX, to take charge of the development of this project.
Concession Iracoubo-Sud: N° de Permis 04/10 Superficie en km² 208,6
1975 to 1995 | Prospection by Inventaire Minier de Guyane.
1999 to 2003 | Extraction of alluvial gold, under Extraction Authorizations, by local artisans.
2007 | EPL application submitted for Iracoubo-Sud by Golden Star Ressources Minières S.A.R.L.
2010 | Iracoubo Sud EPL granted.
2010 | Following its takeover by Auplata, Golden Star Ressources Minières S.A.R.L. becomes Armina Ressources Minières S.A.R.L.
2014 | Strategic joint-venture agreement is signed with Newmont Mining.
2016 | First exploration phase completed under the partnership with Newmont Mining : Newmont holds 51% of the capital of Armina Ressources Minières. Auplata retains 49% of the joint venture.
N. de Permis: 04/10
Superficie en km²: 208,6
1975 à 1995 Travaux de recherche de l’Inventaire Minier de la Guyane.
1999 à 2003Exploitations d’or alluvionnaire, sur AEX, par des artisans locaux.
2007 Dépôt de la demande de PER de Iracoubo-Sud par Golden Star Ressources Minières S.A.R.L.
2010 Octroi du PER Iracoubo Sud.
2010 Suite à son rachat par Auplata, Golden Star Ressources Minières S.A.R.L. devient Armina Ressources Minières S.A.R.L.
2014 Signature d’un accord stratégique de joint-venture avec Newmont Mining.
2016 Finalisation de la 1ère phase d’exploration dans le cadre du partenariat avec Newmont Mining:
Newmont détient 51% au capital d’Armina Ressources Minières. Auplata conserve 49% de la coentreprise.
Le permis exclusif de recherche (PER) d’Adzopé se situe près d’Abidjan dans le sud-est de la Côte d’Ivoire. Il couvre environ 186 km². OMCI a conclu l’acquisition, en 2013, auprès de Newmont Mining du permis minier d’Adzopé. Ce permis est actuellement en cours de renouvellement. Au cours des premières campagnes de forage, deux zones se sont révélées particulièrement intéressantes : *Zone de Kong – 64 forages – 3 508 mètres : anomalies aurifères *Zone d’Adonkoi – 44 forages – 3 145 mètres : 2m@5,4g/t, 12m@1,54g/t, 4m@5,49g/t, 2m@10,8g/t. Dès renouvellement du permis, OMCI est déterminée à poursuivre les campagnes de forages, en s’appuyant sur son partenaire industriel et financier, afin de valoriser un potentiel qui pourrait atteindre le million d’onces sur ce permis.
2015 Acquisition par Auplata d’OMCI en Côte d’Ivoire et entrée du Groupe
Atlantique au capital d’OMCI.
2016 Accord stratégique entre Auplata et Newcrest Mining en Côte d’Ivoire.
Concession Dieu Merci: N° de Permis 04/80 – Superficie en km² 102,40
Concession La Victoire: N° de Permis 03/80 – Superficie en km² 21,60
Concession Renaissance: N° de Permis 02/80 – Superficie en km² 12,50
2015 Acquisition par Auplata d’OMCI en Côte d’Ivoire et entrée du Groupe
Atlantique au capital d’OMCI.
2016 Accord stratégique entre Auplata et Newcrest Mining en Côte d’Ivoire.
Domaine plombifère de Midelt :
Les filons de la Hautes Moulouya se situent dans la province de Midelt. Depuis 2011 un programme de recherche comportant des travaux topo-géologique, d’échantillonnage et des campagnes de sondages carottés ont été réalisé sur ce domaine. Pas moins de 9.000 mètres de sondages carottés on été réalisés à ce jour. Les résultats sont encourageants et ont permis de mettre en évidence des ressources d’environ 1 500 000 t à 4% Pb. Une filiale de CMT a été créée, MINREX, pour prendre en charge le développement de ce projet.
Adzopé’s exclusive research permit (PER) is located near Abidjan in south-eastern Ivory Coast. It covers a total area of 186 km². OMCI completed the acquisition, in 2013, of the Adzopé mining permit from Newmont Mining. This permit is currently being renewed. During the first drilling campaigns, two zones proved to be particularly interesting : * Zone of Kong – 64 drillings – 3,508 meters: gold anomalies *Zone of Adonkoi – 44 drillings – 3,145 meters : 2m@5,4g/t, 12m@1,54g/t, 4m@5,49g/t, 2m@10,8g/t The entire area explored is characterized by highly maintained agricultural fields. We find fields of cocoa, rubber, coffee as well as mandarin trees, manioc and grapefruits which will make it very difficult to develop the site. Mineralization appears subvertical and this type of mineralization can be difficult to target and study by drilling. Despite some interesting anomalous zones, this permit by its context and geology does not demonstrate an interest that would justify an additional exploration campaign.
2015 Auplata acquires OMCI in Ivory Coast and Groupe Atlantique takes a stake in OMCI.
2016 Exclusive negotiations between AUPLATA and Newcrest for a strategic agreement in Ivory Coast.
On the 25th of February 2015, the Council of Ministers granted OMCI, for a first period of 4 years, two PERs called PER Mont Goma Sud (445 km²) and Mont Goma Nord (228 km²), for a total area of 673 km². These two PERs are located some 12 km southwest of the city of Seguela in western Ivory Coast. Between 2009 and 2010, a geochemical prospecting campaign revealed 4 anomalies that should justify the continuation of the exploration on
these two PER. These gold occurrences seem to occupy privileged positions, meaning that they are located at the edge of the Intrageo-synclines or (IGS) that control almost all the gold regions in the Ivory Coast. The search for gold deposits along the SEGUELA shear zone deserves further examination.
Concession Mont Goma
Superficie en km² 299,4
2015 Auplata acquires OMCI in Ivory Coast and Groupe Atlantique takes a stake in OMCI.
2015 Exclusive negotiations between Auplata and Newcrest for a strategic agreement in Ivory Coast.
The mining center of Tighza is located in the administrative region of Meknes – Tafilalet, in the Middle Atlas, 5 km from the town of M’rirt (90 km south of Meknes).
The farm occupies the center of an area of high hills rising to 1,494 m at Jbel Aouam, and between the trays of M’rirt southeast and Tanadra west.
Geologically, the mining center is located in the northeastern part of Hercynian Morocco. It is integrated in the evolution of the magmatic and hydrothermal events of the northern part of the Moroccan Meseta and is characterized by four granitic points and Pb / Zn / Ag / Au / W polymetallic mineralizations:
. Lead, zinc and silver in the form of MF veins, galena and silver blende
. Gold, vein or in skarns, bound to quartz and sulphides
. Tungsten stratoid and vein, in the form of scheelite and wolframite.
Key figures
. Annual production: 320 000 ttv, 25 600 t of Pb-Ag concentrates, 4 300 t of Zn concentrates.
. 3 seats in operation
. Hollow vein structures and rooting known from surveys over 1000m
. Staff: 300 people, including 25 executives
. Research budget: 35 to 50 million dh / year
. Annual investments: 40 to 45 million dirhams.
Ore extraction
The Tighza mine is underground and operates 3 veins: Signal, Ighrem Aoussar and Sidi Ahmed. Each of the three operating headquarters has two main wells, one for extraction and the other for service. These wells reach depths of more than 750 m.
The exploitation of the Tighza site currently uses three methods of exploitation, according to the morphology of the deposit and its geotechnical characteristics (land holdings, deepening of mineralization, width of mineralization, mineralization richness, water presence, etc. .).
The mining cycle at the Tighza mine can be illustrated as follows:
Production background – Extraction – Processing
The reserves and exploitable resources of the Tighza mining site, calculated at the end of December 2017, amount to more than 5,977 Kttv of ore. The average geological grades at the end of December 2017 are 7.54% for lead, 1.06% for zinc and 147 gr / t for silver. The research work carried out in parallel with the operation is intended to rebuild the reserves, prepare the mine and consequently extend the life of the mine site. These have made it possible over the last few years to restore them beyond exploited tonnages. Research work consists mainly of:
Geophysics and geochemistry from the surface.
Soundings from the day or from the bottom of the mine;
Mining works (galleries, wells and chimneys);
The evolution of resources and reserves between 2016 and 2017 is detailed in the following table (in Kt):
Midelt lead field:
The veins of Hautes Moulouya are located in the province of Midelt. Since 2011, a research program involving topo-geological work, sampling and core drilling surveys has been carried out in this area. No less than 9000m of daytime soundings were carried out. The results are encouraging and have highlighted resources from about 1,500,000 t to 4% Pb. A subsidiary of CMT has been created, MINREX, to take charge of the development of this project.
Tabaroucht Mine (Copper):
The Tabaroucht mining area located 50 km southeast of the town of Beni Mellal Fig 2, contains a copper mineralization hosted in a layer affecting the Cretaceous sandstones and the base of the Dogger limestones. This layer shows a dimension 250 m by 250 m on a power of 12 m, slightly sloping to the north and flush in some places. The copper mineralization is 70% oxidized. CMT has carried out several preliminary research works on these mineralizations (soundings, small wells, two galleries). This work made it possible to estimate the resource reserves in this area, which amount to more than 2 million tonnes of ore with a copper content of 1.4%. The tests for the treatment of this ore are in progress.
Concession Iracoubo-Sud: N° de Permis 04/10 Superficie en km² 300
1975 to 1995 | Prospection by Inventaire Minier de Guyane.
1999 to 2003 | Extraction of alluvial gold, under Extraction Authorizations, by local artisans.
2007 | EPL application submitted for Iracoubo-Sud by Golden Star Ressources Minières S.A.R.L.
2010 | Iracoubo Sud EPL granted.
2010 | Following its takeover by Auplata, Golden Star Ressources Minières S.A.R.L. becomes Armina Ressources Minières S.A.R.L.
2014 | Strategic joint-venture agreement is signed with Newmont Mining.
2016 | First exploration phase completed under the partnership with Newmont Mining : Newmont holds 51% of the capital of Armina Ressources Minières. Auplata retains 49% of the joint venture.
Concession Couriège: N° de Permis Superficie en km² 14
2010 Obtention du PER de Couriège.
2015 Suite à un complément d’exploration, il est envisagé une campagne de forages.
Concession Bon Espoir: N° de Permis 21/01 Superficie en km² 122.275
Prior to 1960 Localized alluvial placer mining.
1975 to 1996 |Prospection by Inventaire Minier de Guyane.
1995 | WMC Minière S.A.R.L. is created, a subsidiary of Australian group WMC.
1996 to 2000 | Exploration by WMC Minière revealing the Wayamaga gold anomaly.
1996 to 1999 | Local small-scale alluvial mining operations on EPL B.
1997 | Application for EPL at Bon Espoir, as continuation of the former WMC EPLs for Wayamaga and Amadis.
2001 | WMC bought by the South African group GOLD FIELDS. WMC Minière S.A.R.L. becomes GOLD FIELDS Minière S.A.R.L., a wholly-owned subsidiary of GOLD FIELDS Exploration BV.
2001 | Bon Espoir EPL is granted and the exploration phases at the Wayamaga propect continue.
2004 | GOLD FIELDS Minière S.A.R.L. is bought by American-Canadian group Golden Sta Resources Ltd, which in early 2005 becomes Golden Star Ressources Minières S.A.R.L.
2005 | Regional exploration program.
2009 | First renewal granted for the Bon Espoir EPL.
2010 | Following its takeover by Auplata, Golden Star Ressources Minières S.A.R.L. becomes Armina Ressources Minières S.A.R.L.
2014 | Strategic joint-venture agreement is signed with Newmont Mining.
2015 | The Bon Espoir Exclusive Prospecting Licence (EPL) is renewed.
2016 | First exploration phase completed under the partnership with Newmont Mining:Newmont holds 51% of the capital of Armina Ressources Minières. Auplata retains 49% of the joint venture.
Concession Yaou: N° de Permis 04/10 Superficie en km² 300
1904 | Alluvial deposit discovered along Yaou Creek.
1981 to 1983 | The Bureau de Recherches Géologiques et Minières (BRGM) detected a series of geochemical gold anomalies in the sector between Maripasoula and Yaou Creek.
1993 | Guyanor Ressources acquires the rights to the prospecting licence held by BRGM and BHP Biliton.
1994 to 1998 | Guyanor Ressources and Cambior carry out an intensive prospecting program.
1997 | Cambior acquires 50% of the project.
1999 to 2005 | The Yaou site is guarded and maintained.
1999 | Despite Guyanor and Cambior having filed a concession application, the project is abandoned for financial reasons.
2002 | Golden Star Resources (parent company of Guyanor Ressources) acquiresCambior’s 50% stake in the Dorlin mining project.
2004 | Auplata acquires 100% of the Yaou mining project.
2005 | Auplata starts building the Yaou extraction plant.
2006 | First gold production from Yaou mine.
2012 | to 2013 | Drilling programs and start of operations at the Dorlin site.
2014 | Auplata supports Operation Harpie, and mining zones in southern French Guiana are secured by French armed forces and the national police.
2015 | Additional exploration work at the Dorlin site.
Concession Dorlin: N° de Permis Superficie en km² 84
1900 to 1955 | The region is a major placer mining centre (production : 11 tonnes of gold).
1950 to 1960 | Prospection by Bureau Minier Guyanais (BMG).
1975 to 1989 | Exploration by the Bureau de Recherches Géologiques et Minières
(BRGM), working with the company BHP Biliton in the 1980s.
1993 | Guyanor Ressources acquires the rights to the prospecting licence held by BRGM and BHP Biliton
1994 to 1998 | Guyanor Ressources and the company Cambior carry out an intensive prospecting program for primary gold
1997 | Cambior acquires 50% of the mining project
1999 | to 2005 | Despite Guyanor and Cambior having filed a concession
application, the project is abandoned for financial reasons
June 2002 | Golden Star (parent company of Guyanor Ressources) acquires Cambior’s 50% stake in the Dorlin mining project
December 2004 | Auplata acquires 100% of the Dorlin mining project.
Concession Dieu Merci: N° de Permis 04/80 – Superficie en km² 102,40
Concession La Victoire: N° de Permis 03/80 – Superficie en km² 21,60
Concession Renaissance: N° de Permis 02/80 – Superficie en km² 12,50
1873 | First gold discovery in the commune of Saint-Elie.
1878 to 1919 | The zone is exploited by « Société Anonyme des Gisements d’Or de Saint-Elie »(production : 13 tonnes of gold).
1923 to 1956 | Site taken over by « Société Nouvelle de Saint-Elie et Adieu-Vat » (production: 3.6 tonnes of gold).
1996 | The Renaissance and Victoire concessions are granted to Texmine, which also obtains.
Concession Couriège: N° de Permis Superficie en km² 14
2010 Obtention du PER de Couriège.
2015 Suite à un complément d’exploration, il est envisagé une campagne de forages.
Concession Bon Espoir: N° de Permis 21/01 Superficie en km² 122.275
Prior to 1960 Localized alluvial placer mining.
1975 to 1996 |Prospection by Inventaire Minier de Guyane.
1995 | WMC Minière S.A.R.L. is created, a subsidiary of Australian group WMC.
1996 to 2000 | Exploration by WMC Minière revealing the Wayamaga gold anomaly.
1996 to 1999 | Local small-scale alluvial mining operations on EPL B.
1997 | Application for EPL at Bon Espoir, as continuation of the former WMC EPLs for Wayamaga and Amadis.
2001 | WMC bought by the South African group GOLD FIELDS. WMC Minière S.A.R.L. becomes GOLD FIELDS Minière S.A.R.L., a wholly-owned subsidiary of GOLD FIELDS Exploration BV.
2001 | Bon Espoir EPL is granted and the exploration phases at the Wayamaga propect continue.
2004 | GOLD FIELDS Minière S.A.R.L. is bought by American-Canadian group Golden Sta Resources Ltd, which in early 2005 becomes Golden Star Ressources Minières S.A.R.L.
2005 | Regional exploration program.
2009 | First renewal granted for the Bon Espoir EPL.
2010 | Following its takeover by Auplata, Golden Star Ressources Minières S.A.R.L. becomes Armina Ressources Minières S.A.R.L.
2014 | Strategic joint-venture agreement is signed with Newmont Mining.
2015 | The Bon Espoir Exclusive Prospecting Licence (EPL) is renewed.
2016 | First exploration phase completed under the partnership with Newmont Mining:Newmont holds 51% of the capital of Armina Ressources Minières. Auplata retains 49% of the joint venture.
Concession Yaou: N° de Permis 04/10 Superficie en km² 300
1904 | Alluvial deposit discovered along Yaou Creek.
1981 to 1983 | The Bureau de Recherches Géologiques et Minières (BRGM) detected a series of geochemical gold anomalies in the sector between Maripasoula and Yaou Creek.
1993 | Guyanor Ressources acquires the rights to the prospecting licence held by BRGM and BHP Biliton.
1994 to 1998 | Guyanor Ressources and Cambior carry out an intensive prospecting program.
1997 | Cambior acquires 50% of the project.
1999 to 2005 | The Yaou site is guarded and maintained.
1999 | Despite Guyanor and Cambior having filed a concession application, the project is abandoned for financial reasons.
2002 | Golden Star Resources (parent company of Guyanor Ressources) acquiresCambior’s 50% stake in the Dorlin mining project.
2004 | Auplata acquires 100% of the Yaou mining project.
2005 | Auplata starts building the Yaou extraction plant.
2006 | First gold production from Yaou mine.
2012 | to 2013 | Drilling programs and start of operations at the Dorlin site.
2014 | Auplata supports Operation Harpie, and mining zones in southern French Guiana are secured by French armed forces and the national police.
2015 | Additional exploration work at the Dorlin site.
Concession Dorlin: N° de Permis Superficie en km² 84
1900 to 1955 | The region is a major placer mining centre (production : 11 tonnes of gold).
1950 to 1960 | Prospection by Bureau Minier Guyanais (BMG).
1975 to 1989 | Exploration by the Bureau de Recherches Géologiques et Minières
(BRGM), working with the company BHP Biliton in the 1980s.
1993 | Guyanor Ressources acquires the rights to the prospecting licence held by BRGM and BHP Biliton
1994 to 1998 | Guyanor Ressources and the company Cambior carry out an intensive prospecting program for primary gold
1997 | Cambior acquires 50% of the mining project
1999 | to 2005 | Despite Guyanor and Cambior having filed a concession
application, the project is abandoned for financial reasons
June 2002 | Golden Star (parent company of Guyanor Ressources) acquires Cambior’s 50% stake in the Dorlin mining project
December 2004 | Auplata acquires 100% of the Dorlin mining project.
Concession Dieu Merci: N° de Permis 04/80 – Superficie en km² 102,40
Concession La Victoire: N° de Permis 03/80 – Superficie en km² 21,60
Concession Renaissance: N° de Permis 02/80 – Superficie en km² 12,50
1873 | First gold discovery in the commune of Saint-Elie.
1878 to 1919 | The zone is exploited by « Société Anonyme des Gisements d’Or de Saint-Elie »(production : 13 tonnes of gold).
1923 to 1956 | Site taken over by « Société Nouvelle de Saint-Elie et Adieu-Vat » (production: 3.6 tonnes of gold).
1996 | The Renaissance and Victoire concessions are granted to Texmine, which also obtains.
Superficie en km²: 84
1900 à 1955 La région est un centre d’orpaillage important (production : 11 tonnes d’or).
1950 à 1960 Prospections du Bureau Minier Guyanais (BMG).
1975 à 1989 Travaux d’explorations par le Bureau de
Recherches Géologiques et Minières (BRGM) associé à la société BHP Biliton dans les années 80.
1993 Acquisition par la société Guyanor Ressources des droits sur les permis de recherches détenus par le BRGM et BHP Biliton.
1994 à 1998 Guyanor Ressources et la société Cambior réalisent un programme intensif de recherches d’or primaire.
1997 Cambior acquiert 50 % du projet minier.
1999 à 2005 Malgré le dépôt d’une demande de concessionpar Guyanor et Cambior, le projet est abandonné pour des raisons financières.
Juin 2002 La société Golden Star (maison mère de Guyanor Ressources) acquiert les 50 % que Cambior détient sur le projet minier Dorlin.
Décembre 2004 Auplata acquiert 100 % du projet minier de Dorlin.
N. de Permis: 21/01
Superficie en km²: 14
2010 Obtention du PER de Couriège.
2015 Suite à un complément d’exploration, il est envisagé une campagne de forages.
Les Permis de recherche (PR) « Mont Goma Nord » PR 273et « Mont Goma Sud »PR 451 se situent dans le département de Séguéla et Vavoua dans l’ouest de la Côte d’Ivoire. Une campagne de prospection géochimique, géophysique au sol, tarières et forages a été réalisée entre 2015 et 2019, elle a permis de mettre en évidence 4 zones anormales justifiant la poursuite de l’exploration sur les permis de Mont Goma, d’une surface totale de 673,8 km². Les permis de recherche Mont Goma Sud et Mont Goma Nord ont été attribués à OMCI lors du conseil des Ministres du 25 février 2015, pour une première période de 4 ans, venue à échéance en février 2019. Des demandes de renouvellement sont en cours et la société est actuellement en phase de préparation d’une nouvelle campagne d’exploration afin de tester de nouvelles anomalies et réaliser de nouveaux forages en fonction des résultats obtenues.
PER de Mont Goma Nord
Superficie en km² 299,4
PER de Mont Goma Sud
Superficie en km² 374,4
2015 Acquisition par Auplata d’OMCI en Côte d’Ivoire et entrée du Groupe Atlantique au capital d’OMCI.
2015 Négociations exclusives entre Auplata et Newcrest pour un accord stratégique en Côte d’Ivoire.
Mine de Tabaroucht (Cuivre) :
Le domaine minier de Tabaroucht situé à 50 Km au Sud-Est de la ville de Beni Mellal Fig 2, comporte une minéralisation cuprifère encaissée dans une couche affectant les grès crétacés et la base des calcaires du Dogger. Cette couche montre une dimension 250 m sur 250 m sur une puissance de 12 m, légèrement pentée vers le nord et affleurante à certains endroits. Les minéralisations cuprifères sont à 70% oxydées. CMT a réalisé plusieurs travaux de recherche préliminaires sur ces minéralisations (sondages, petits puits, deux galeries). Ces travaux ont permis de bien estimer les réserves – ressources de ce domaine qui s’élèvent à plus de 2 millions de tonnes de minerai avec une teneur en cuivre de 1,4%. Les essais de traitement de ce minerai sont en cours de réalisation.
Le centre minier de Tighza est situé dans la région administrative de Meknès – Tafilalet, au Moyen Atlas, à 5 Km de la ville de M’rirt (90 Km au sud de Meknès).
L’exploitation occupe le centre d’une zone de hautes collines culminant à 1 494 m au Jbel Aouam, et comprise entre les plateaux de M’rirt au Sud Est et de Tanadra à l’ouest.
Géologiquement, le centre minier est situé dans la partie nord orientale du Maroc hercynien. Il s’intègre dans l’évolution des événements magmatiques et hydrothermaux de la partie nord de la Meseta marocaine et se caractérise par quatre pointements granitiques et des minéralisations polymétalliques Pb/Zn/Ag/Au/W :
. Le plomb, le zinc et l’argent, sous forme de filons hectométriques, de galène et blende argentifères
. L’or, filonien ou dans des skarns, lié au quartz et à des sulfures
. Le tungstène stratoïde et filonien, sous forme de scheelite et wolframite.
Chiffres clés
. Production annuelle: 320 000 ttv, 25 600 t de concentrés de Pb-Ag, 4 300 t de concentrés de Zn.
. 3 sièges en exploitation
. Structures filoniennes hectométriques et un enracinement connu par sondages sur plus de 1000m
. Effectifs : 300 personnes, dont 25 Cadres
. Budget de recherche : 35 à 50 Millions dh/an
. Investissements annuels : 40 à 45 Millions dh.
. Réserves estimées à plus de 5 000 000ttv
Extraction du minerai
La mine de Tighza est souterraine et exploite 3 filons : Signal, Ighrem Aoussar et Sidi Ahmed. Chacun des trois sièges d’exploitation a comme infrastructure principale deux puits, un pour l’extraction et l’autre de service. Ces puits atteignent des profondeurs de plus de 750 m.
L’exploitation du site de Tighza utilise actuellement trois méthodes d’exploitation, en fonction de la morphologie du gisement et de ses caractéristiques géotechniques (tenue des terrains, approfondissement des minéralisations, largeur des minéralisations, richesse des minéralisations, présence d’eau, etc.).
Le cycle de l’exploitation au niveau de la mine de Tighza peut s’illustrer comme suit :
Production fond – Extraction – Traitement
Les réserves et ressources exploitables du site minier de Tighza, calculées à fin Décembre 2017, ressortent à plus de 5 977 Kttv de minerai. Les teneurs géologiques moyennes à fin Décembre 2017 sont de 7,54% pour le plomb, 1,06% pour le zinc et 147 gr/t pour l’argent. Les travaux de recherche menés en parallèle avec l’exploitation sont destinés à reconstituer les réserves, à préparer la mine et par conséquent, prolonger la durée de vie du site minier. Celles-ci ont permis sur les dernières années à les reconstituer au-delà des tonnages exploités. Les travaux de recherche consistent principalement en :
Des travaux de géophysique et de géochimie à partir de la surface.
Des sondages à partir du jour ou à partir du fond de la mine ;
Des travaux miniers (galeries, puits et cheminées).
Le centre minier de Tighza est situé dans la région administrative de Meknès – Tafilalet, au Moyen Atlas, à 5 Km de la ville de M’rirt (90 Km au sud de Meknès). L’exploitation occupe le centre d’une zone de hautes collines culminant à 1 494 m au Jbel Aouam, et comprise entre les plateaux de M’rirt au Sud Est et de Tanadra à l’ouest. Géologiquement, le centre minier est situé dans la partie nord orientale du Maroc hercynien. Il s’intègre dans l’évolution des événements magmatiques et hydrothermaux de la partie nord de la Meseta marocaine et se caractérise par quatre pointements granitiques et des minéralisations polymétalliques Pb/Zn/Ag/Au/W :
. Le plomb, le zinc et l’argent, sous forme de filons hectométriques, de galène et blende argentifères
. L’or, filonien ou dans des skarns, lié au quartz et à des sulfures
. Le tungstène stratoïde et filonien, sous forme de scheelite et wolframite.
Chiffres clés
. Production annuelle: 320 000 ttv, 25 600 t de concentrés de Pb-Ag, 4 300 t de concentrés de Zn.
. 3 sièges en exploitation
. Structures filoniennes hectométriques et un enracinement connu par sondages sur plus de 1000m
. Effectifs : 300 personnes, dont 25 Cadres
. Budget de recherche : 35 à 50 Millions dh/an
. Investissements annuels : 40 à 45 Millions dh.
. Réserves estimées à plus de 5 000 000ttv
Extraction du minerai
La mine de Tighza est souterraine et exploite 3 filons : Signal, Ighrem Aoussar et Sidi Ahmed. Chacun des trois sièges d’exploitation a comme infrastructure principale deux puits, un pour l’extraction et l’autre de service. Ces puits atteignent des profondeurs de plus de 750 m.
L’exploitation du site de Tighza utilise actuellement trois méthodes d’exploitation, en fonction de la morphologie du gisement et de ses caractéristiques géotechniques (tenue des terrains, approfondissement des minéralisations, largeur des minéralisations, richesse des minéralisations, présence d’eau, etc.).
Le cycle de l’exploitation au niveau de la mine de Tighza peut s’illustrer comme suit :
Production fond – Extraction – Traitement
Les réserves et ressources exploitables du site minier de Tighza, calculées à fin Décembre 2017, ressortent à plus de 5 977 Kttv de minerai. Les teneurs géologiques moyennes à fin Décembre 2017 sont de 7,54% pour le plomb, 1,06% pour le zinc et 147 gr/t pour l’argent. Les travaux de recherche menés en parallèle avec l’exploitation sont destinés à reconstituer les réserves, à préparer la mine et par conséquent, prolonger la durée de vie du site minier. Celles-ci ont permis sur les dernières années à les reconstituer au-delà des tonnages exploités. Les travaux de recherche consistent principalement en :
Des travaux de géophysique et de géochimie à partir de la surface.
Des sondages à partir du jour ou à partir du fond de la mine ;
Des travaux miniers (galeries, puits et cheminées).
N. de Permis: 21/01
Superficie en km²: 122,275
Avant 1960 Orpaillage alluvionnaire ponctuel.
1975 à 1996 Travaux de l’Inventaire Minier de Guyane.
1995 Création de WMC Minière S.A.R.L., filiale du groupe australien WMC.
1996 à 2000 Réalisation de travaux d’exploration par WMC Minière et mise en évidence de l’anomalie aurifère de Wayamaga.
1996 à 1999 Exploitations d’or alluvionnaire par artisans locaux sur PER B.
1997 Dépôt de la demande de PER de Bon Espoir en continuité des anciens PER B de WMC de Wayamaga et Amadis.
2001 Rachat de WMC par le groupe sud-africain GOLD FIELDS. WMC Minière S.A.R.L. devient GOLD FIELDS Minière S.A.R.L., filiale à 100 % de GOLD FIELDS Exploration BV.
2001 Octroi du PER de Bon Espoir et poursuite des phases d’exploration sur le prospect de Wayamaga.
2004 Rachat de GOLD FIELDS Minière S.A.R.L. par le groupe américo-canadien Golden Star Resources Ltd, qui devient Golden Star Ressources Minières S.A.R.L. début 2005.
2005 Campagne d’exploration régionale.
2009 Octroi du 1er renouvellement du PER de Bon Espoir.
2010 Suite à son rachat par Auplata, Golden Star Ressources Minières S.A.R.L. devient Armina Ressources Minières S.A.R.L.
2014 Signature d’un accord stratégique de joint-venture avec Newmont Mining.
2015 Renouvellement du Permis d’Exploration (PER) de Bon Espoir.
2016 Finalisation de la 1ère phase d’exploration dans le cadre du partenariat avec Newmont Mining : Newmont détient 51% au capital d’Armina Ressources Minières. Auplata conserve 49% de la coentreprise.
N. de Permis: 04/10
Superficie en km²: 300
1904 Découverte du gisement alluvionnaire de la crique Yaou.
1981 à 1983 Le Bureau de Recherches Géologiques et Minières(BRGM) détecte une série d’anomalies géochimiques en or dans le secteur compris entre Maripasoula et la crique Yaou.
1993 La société Guyanor Ressources acquiert les droits sur les permis de recherches détenus par le BRGM et la société BHP Biliton.
1994 à 1998 Guyanor Ressources, associé à la société Cambior,entreprend un programme intensif d’exploration.
1997 Cambior acquiert 50 % du projet.
1999 à 2005 Le site et le camp de Yaou sont gardés et entretenus.
1999 Malgré le dépôt d’une demande de concession par Guyanor et Cambior, le projet est abandonné pour des raisons financières.
2002 La société Golden Star Resources (maison mère de Guyanor Ressources) rachète les 50 % que Cambior détient sur le projet minier de Yaou.
2004 Auplata acquiert 100 % du projet minier Yaou.
2005 Auplata lance la construction de l’usine d’extraction de Yaou.
2006 Première production d’or de la mine de Yaou.
2012 à 2013 Campagnes de forage et à la mise en exploitation du site de Dorlin.
2014 Soutien d’Auplata à la mission Harpie, de sécurisation des zones minières du sud de la Guyane française par l’armée française et la gendarmerie nationale.